250 Tonne Press, CHING FONG Model: G2-250, Year of Manufacture: 1996, From working Environment

Quantity:
1
Location:
4 Jeanes Street, Beverley SA 5009, Australia

To bid on this item you must submit a written offer.

Please login or click here to submit your offer via e-mail

For more information, click here to view details of the Sale.

Description

  • Shut Hgt Min : 370
  • Press Tables
    • Max : 550
    • Bottom L - R / F - B : 2700 x 900
    • Top L - R / F - B : 2100 X 700
  • Length of Stroke : 280
  • Slide Adjustment : 120
  • Tool Shut Height : 400
  • Air Cush Strk : 100
  • Air Cush Ton : 2 x 14T
  • Max Coil Width : 80 to 500
  • Max Coil Feed : 10000
  • Coil Feed Height : 250 (80-260)
  • Max Coil Thick : 0.6 to 5.0
  • Strks per min : 13 - 30


[97118+2]

This item has been viewed 221 times

 Auction Description

Automotive Parts Manufacturer Major Onsite Clearance - EOI Presses, Feeder/Uncoilers, Weld Cells, Robots, Plant & Equipment

Under instructions from Precision Components Australia Pty Ltd

EOI Closes: Thursday 31st January 2019, unless sold prior

To submit an offer email Precision@biddingonline.com.au with the specified lot number.

Inspection:  By Appointment

Location: 4 Jeanes Street, Beverley SA 5009

Contact: Andrew Monks on 0414 340 399 Precision@biddingonline.com.au

Please Note the Following Sale Specific Terms - By registering for this EOI, and/or submitting an offer, you acknowledge these, and all other terms of sale as specified. 

Collection: By Appointment as arranged with Evans Clarke National post closure of auction.

Payment: All assets must be paid for in full prior to any work commencing onsite.

Asset Removal: It is the purchasers responsibility to remove all purchased lots from site. This includes all asset preparation for transport.

Tradespeople and Contractors: All (e.g. electricians, plumbers, riggers, equipment operators) must produce relevant licences and/or white card prior to the commencement of any work on site.

Tooling, Plant & Equipment: Any equipment used onsite in the removal of purchased items must be tested & tagged, and/or compliant with OHW&S legislation and requirements,

Onsite Work: All work carried out onsite must be compliant with all OHW&S legislation, appropriate PPE must be utilised as required or specified.

Site Access: All site attendees must comply with directions given by the Vendor or Auction Staff

Environmental Compliance: All removal, disassembly of assets and work conducted onsite must be compliant with the Environmental Protection Act 1993